Project Details
Type of Project
:
INSTITUTIONAL
Name of Project
:
The Metropolitan Atlanta Rapid Transit Agency
Location of Project
:
Atlanta, GA
Service Provided
:
Employee, Construction Management, Owner Representation, Program Management, Project Management
Client
:
The Metropolitan Atlanta Rapid Transit Agency
Owner
:
The Metropolitan Atlanta Rapid Transit Agency
Architect
:
Various
Contractor
:
Various
Project Budget
:
N/A
Description
:
The Metropolitan Atlanta Rapid Transit Authority is the principal public transport operator in the Atlanta metropolitan area. Formed in 1971 as strictly a bus system, MARTA operates a network of bus routes linked to a rapid transit system consisting of 48 miles (77 km) of rail track with 38 subway stations. MARTA’s rapid transit system is the eighth-largest rapid transit system in the United States by ridership.
MARTA operates almost exclusively in Fulton, Clayton, and DeKalb counties, although they maintain bus service to two destinations in neighboring Cobb County (Six Flags Over Georgia and the Cumberland Transfer Center next to the Cumberland Mall), while Doraville station serves portions of Gwinnett County via Ride Gwinnett buses. MARTA also operates Mobility, a separate paratransit service for disabled customers.
In 2023, the entire system (bus and subway lines) had 64,306,800 rides, or about 202,600 per weekday in the fourth quarter of 2023. MARTA’s first bus rapid transit (BRT) line is currently under construction and is scheduled to open in Summer 2025. The 5-mile line will run from downtown Atlanta, through Summerhill, and end at the Atlanta BeltLine. The line, named the “Summerhill BRT Line”, will utilize new electric buses.
